REMINDER: Bid Publicity

Following bids have been invited with given due date and tender ID.

SR.N.

Name of Work

Length

Cost

Tender ID on CPPP

Due Date

Arunachal Pradesh

 

1.

Two-Laning of Existing Khupa - Hayuliang – Hawai Road on EPC basis from design Km. 0.000  (Khupa) to Km. 17.000 [Existing Km 95.800 of (Khupa – Hayuliang Road) to Km 8.970  (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh Under SARDP-NE, Project  Highway.

0.00Km to 17.00Km

194.66 cr.

2016_NHIDC_107004_1

15.02.2017

2.

Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from design Km. 17.000 (Khupa) to Km.  34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh  under SARDP-NE, Project Highway.

17.00km to 34.00 km

195.23 cr.

2016_NHIDC_107013_1

15.02.2017

3.

Two-Laning of Existing Hayuliang – Hawai Road on EPC basis from Design Km. 34.000 to Km. 51.825  [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] in the state of Arunachal Pradesh Under  SARDP-NE, Project Highway.

34.00 km to 51.825 km

203.36 cr.

2016_NHIDC_107016_1

15.02.2017

4.

Two-Laning of Hayuliang– Hawai bypass Road on EPC basis from design Km. 51.825 to Km.  63.131 Existing Km 45.050 of Hayuliang – Hawai road to Hawai Town in the state of  Arunachal Pradesh Under SARDP-NE.

51.825 km to 63.131 km

198.22 cr

2016_NHIDC_107023_1

15.02.2017

 5.

Construction of Meka-Roing- Hunli from existing km 16 of Roing Hunli Road to km 21.5 of Hunli-Anini Road (total length=74.863 km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis.

16.00  km to 21.500 km

1253.10 cr.

2016_NHIDC_88165_1

15.02.2017

 

 

 

 

 

 

 

 

 

 

 

6.

Two-Laning of Joram Koloriang Road (NH-713) on EPC basis from design Km. 20.000 to Km. 32.050 Existing Km 20.000 to Km 35.150 in the state of Arunachal Pradesh under SARDP-NE

Km 20.000 to Km 35.150

123.65 Cr.

2016_NHIDC_154675_1

16.02.2017

 

 

7.

Two-Laning of Joram Koloriang Road (NH-713) on EPC basis from design Km. 32.050 to Km. 44.000 Existing Km 35.150 to Km 50.050 in the state of Arunachal Pradesh under SARDP-NE

Km 35.150 to Km 50.050

124.66 Cr.

2016_NHIDC_154679_1

16.02.2017

 

 

8.

Two-Laning of Joram Koloriang Road (NH-713) on EPC basis from design Km. 44.000 to Km. 59.363 Existing Km 50.050 to Km 70.000 in the state of Arunachal Pradesh under SARDP-NE

Km 50.050 to Km 70.000

163.84 Cr.

2016_NHIDC_154685_1

16.02.2017

 

 

9.

Two-Laning of Joram Koloriang Road (NH-713) on EPC basis from design Km. 138.000 to Km. 154.036 Existing Km 138.000 to Km 158.000 in the state of Arunachal Pradesh under SARDP-NE

Km 138.000 to Km 158.000

176.41 Cr.

2016_NHIDC_154688_1

16.02.2017

10.

Two-Laning of Joram Koloriang Road (NH 713) on EPC basis from existing Km 70.000 to Km 88.700 (design Km. 59.363 to Km. 77.363) in the state of Arunachal Pradesh under SARDP-NE

 

70.000 to Km 88.700

216.71 Cr.

2017_NHIDC_162573_1

21.02.2017

11.

Two-Laning of Joram Koloriang Road (NH 713) on EPC basis from design Km. 77.363 to Km. 92.363 (Existing Km 88.700 to Km 104.850) in the state of Arunachal Pradesh under SARDP-NE

88.700 to Km 104.850

167.28 Cr.

2017_NHIDC_162584_1

21.02.2017

 

12.

Two-Laning of Joram Koloriang Road (NH 713) on EPC basis from existing Km 104.850 to Km 122.600 (design Km. 92.363 to Km. 107.363) in the state of Arunachal Pradesh under SARDP-NE

104.850 to Km 122.600

143.59 Cr.

2017_NHIDC_162587_1

21.02.2017

 

13.

Two-Laning of Joram Koloriang Road (NH 713) on EPC basis from existing Km 122.600 to Km 138.000 (design Km. 107.363 to Km. 122.353) in the state of Arunachal Pradesh under SARDP-NE

 

122.600 to Km 138.000

132.67 Cr.

2017_NHIDC_162589_1

21.02.2017

Nagaland

 

1.

Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka- Dimapur Section (Dimapur Bypass) of NH-36 and 39 in the state of Nagaland on Engineering Procurement and Construction basis

132.375 km to  158.058  km

549.10 Cr.

2016_NHIDC_121588_1

15.02.2017

Meghalaya

 

 

1.

Rehabilitation and upgradation to two lane with earthen shoulders of Nongstoin Wahkhaji road section Design chainage Km. 0.00 to Km. 43.060 in the state of Meghalaya under SARDP-NE on Engineering Procurement and Construction EPC Mode

Km. 0.00 to Km. 43.060

269.32 Cr.

2017_NHIDC_165605_1

22.02.2017

Tripura

 

 

1.

Construction of Extra-dosed/ Cable stayed RCC Bridge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8 in the state of Tripura on EPC mode

Bridge Project

88.68 Cr.

2017_NHIDC_163826_1

21.02.2017

 

It Is request to  give  it wide publicity for competitive biddings. In case of any  problem/ clarification kindly  contact at

Y.C.Srivastava General Manager (Tech)

NHIDCL, 3rd Floor , 4, Parliament Street,

New Delhi-110001 Ph. 011-23461617

 E-mail : yogesh.chandra15@gov.in, yogena05bro@gmail.com

Mobile: 9599022989